Heated Trunkline MIP

 

 

 

In addition to the standard MIP setup, S2C2 can run a system that uses a heated trunkline. Unlike traditional MIP setups where the MIP probe is the only portion of the system that is heated, Geoprobe‚Äôs HTL will be used to heat the entire trunkline to approximately 100 degrees C along its entire length.  This reduces the typical slurred baseline drop seen when dealing with high concentrations of contaminants.

For more information contact Matthew Ruf at mruf@s2c2inc.com

For online inquires:

mruf@s2c2inc.com

S2C2 Inc.  5 Johnson Drive, Suite 12 Raritan, NJ 08869 

Office:  (908) 253-3200  Fax:  (908) 253-9797  

  • Twitter Social Icon
  • Facebook App Icon
  • YouTube Classic
  • Google+ App Icon
  • LinkedIn App Icon
  • Black Instagram Icon