top of page

Heated Trunkline MIP

 

 

 

In addition to the standard MIP setup, S2C2 can run a system that uses a heated trunkline. Unlike traditional MIP setups where the MIP probe is the only portion of the system that is heated, Geoprobe’s HTL will be used to heat the entire trunkline to approximately 100 degrees C along its entire length.  This reduces the typical slurred baseline drop seen when dealing with high concentrations of contaminants.

S2C2 provides High Resolution Site Characterization services includes: Membrane Interface Probe, Hydraulic Profiling Tool, MiHPT and Data Visualization.
For more information contact Matthew Ruf at mruf@s2c2inc.com
bottom of page